APPLICATION RESULTS

Six outcomes that matter on the shop floor.

We start with what matters on the shop floor: coolant consumption, foam control, sump life, machine cleanliness, tool life, and surface quality. Full application reports are shared directly after we understand your operation.

06essential outcomes
Q1full reports available on request

ESSENTIAL DATA

Results that speak the language of production.

Each result comes from a specific application. We show the outcome here; Q1 shares the full context and report directly.

CONSUMPTION
<50%coolant consumption versus the prior year

Less than half the coolant consumed

With the same shift schedule.

Request the full report
HIGH PRESSURE
ZEROfoam at 110 bar / 1,600 psi

No foam formation

On a machine running high-pressure coolant.

Request the full report
SUMP LIFE
5 YEARSsame coolant in the sump

Five years without ever removing the coolant

The coolant remained in service in the same sump.

Request the full report
CLEANLINESS
12 MONTHSbrass · three shifts · nonstop production

A perfectly clean, like-new machine

After 12 months of nonstop brass machining across three shifts.

Request the full report
TOOL LIFE
+13%tapping tool life vs. the previous product

Longer tool life in severe-duty tapping

On difficult-to-machine exotic alloys, Q1 reduced tool wear versus the previous product.

Request the full report
SURFACE QUALITY
36 HRScontinuous emulsion-to-aluminum contact

No staining or spotting on aluminum

After 36 hours of contact, the aluminum surface remained uniform with Q1; other products left visible rings and spots in the same application.

Request the full report

Results may vary based on the machine, material, water quality, and operating conditions. Each figure applies to the specific application verified by Q1 and is not a performance guarantee.

FROM THE RESULT TO YOUR MACHINE

Which outcome matters most to your operation?

Request the most relevant application report, or validate the opportunity on one representative CNC machine with a 30-day Pilot Test.

Request an application reportRequest a 30-Day Pilot